Maximizing Efficiency: MW FEP Case Study
MW.FEP is an Italian-based Electronics Manufacturing Services (EMS) company, focusing on high-mix, low-volume assembly since 2010. Recognizing the highly competitive nature of the Italian contract manufacturing industry, MW.FEP acknowledged the need to differentiate itself on unparalleled customer experience.
This led MW.FEP to seek out ways to revolutionize their Request For Quote (RFQ) process. MW.FEP knew they could differentiate themselves by making improvements to their process so they could be more responsive to their customer’s needs.
CalcuQuote’s mix of technology and process expertise in the EMS industry made them an ideal partner to help MW.FEP upgrade their quoting process.
About MW.FEP
Company size
Customer
Products in use
Location
general. Not only have they shared the feedback on European needs, but they were clear in their
goals as a company and made it that much easier to implement and ensure their business success.”
Challenges
In 2018, MW.FEP was using an internally built software tool to process all RFQs from their customers, including Bill of Material (BOM) formatting, component costing and labor estimation. Finalizing quotes required five full-time employees to complete approximately 300 quotes per year. The average turn time for quotes was 30 days and it took approximately 40 hours of effort per quote.
Management at MW.FEP recognized the limitations of their current process and how it was inhibiting their goal of being more responsive to customer requests. They decided to implement a new system that would help address several challenges in the RFQ process:
- The overall turntime was too high
- The amount of effort required to complete a quote was too high
- It was too challenging to coordinate among various departments to complete a quote
Their internal solution did not allow them to fulfill their objectives. The main challenge was being responsive to customer requests in a timely manner. As a forward thinking company, they wanted to find the right solution for their challenge and find a way to achieve the best results.
Objective
purchasing, customers and their suppliers. The need for a comprehensive solution, one that was
streamlined and addressed various points along the process (quality, labor, component costing), led
them to CalcuQuote.
Solution and implementation
MW.FEP evaluated various options to solve their key challenges related to the RFQ process and ultimately chose CalcuQuote. The key decision criteria were centered on CalcuQuote’s expertise in the EMS industry, QuoteCQ offering a comprehensive solution for managing everything related to the RFQ process in one place, and the responsiveness that CalcuQuote’s supply chain integrations could bring to the RFQ process.
- Risk assessment to maintain compliance with AS9100
- BOM and material cost management utilizing supplier API integrations and bid sheets
- Labor estimation for prototype and production volumes
- Final preparation of the quote
- And metrics tracking to measure turntime and win rate
Within a few weeks, MW.FEP was up and running with CalcuQuote. MW.FEP is the first Italian based customer for CalcuQuote and helped share feedback to drive changes for currency conversion and other product needs for Europe.
Results
Since implementing CalcuQuote in 2019 MW.FEP’s quote volume has increased 33%. Their team has also priced over 20,000 line items in a single year through the integrations with major component distributors. Overall, the challenge of speed and precision has improved significantly. While not the initial challenge, MW.FEP had the goal to gain more business and increase sales performance and that is exactly what they did with their new system.
MW.FEP has achieved their goals, put their challenges of the RFQ process behind them, and become a prime example for EMS companies in Europe.